Quotations and MOQ

Shirt Manufacturing Quotations: MOQ and Processing Costs

A comparable shirt quote should identify product scope, fabric, trims, quantity, MOQ, sample work, packing, inspection, lead time and delivery terms.

Shirt quotation sheet, fabric swatches and an MOQ calculation
Breaking a shirt quotation into comparable cost items.

A low shirt price is not comparable if the product scope is unclear. Ask each supplier to quote the same specification and separate the cost drivers.

Shirt quotation sheet, fabric swatches and an MOQ calculation

What a useful quote contains

List style, fabric composition and weight, color, trims, size ratio, logo, packaging, quantity, MOQ, sample fee, lead time, inspection and Incoterm. The shirt OEM quotation and MOQ cost breakdown expands this structure.

Read MOQ by project detail

An MOQ may apply to the total style, each color, fabric purchase or special process. Ask the factory to state the assumed quantity and any surcharge for a smaller run. The small-batch shirt MOQ guide helps with pilot planning.

Separate price from delivery scope

Keep factory price, packing, inland transport, export clearance, freight, insurance and destination charges visible. For contract and payment review, use the garment manufacturing contract due-diligence guide.

Request a project-specific review

Mingsheng supports woven-shirt OEM/ODM and private-label work. Send the product file through the contact page so the quantity and specification can be assessed together.

Further reading

Frequently Asked Questions

What is Mingsheng's current MOQ reference?

The current ordinary-project starting reference is 500 pieces, but color, fabric, size mix and special workmanship require project confirmation.

Why do two shirts with the same style have different prices?

Fabric, weight, trims, construction, branding, quantity, packing, inspection and delivery scope can all change the cost.

Should buyers compare quotes before approving a sample?

Use a preliminary quote to plan, but the final comparison should follow a confirmed sample or complete technical specification.

Next Step

Bring clear product specifications for a faster factory assessment

Share reference images, a tech pack, size charts, fabric requirements, quantities and target delivery dates so our team can assess sampling and production options.

Send Your Requirements Browse Shirt Styles